Contacts
Address
USA, Louisiana, Walker, 70785, 17900 Excel Boulevard
Director
Director
Phones of enterprise
management
+1
When placing an order please inform the manager that you've learned the information on Allbiz! Thank you that you buy on Allbiz!
+1
When placing an order please inform the manager that you've learned the information on Allbiz! Thank you that you buy on Allbiz!
Internet
Site:
About enterprise
Excel Modular Scaffold & Leasing Corporation, Company
Excel Modular Scaffold was founded in 1992 when Joe Williams saw the need to improve upon system scaffolds that were in use. The industry had not had any significant advancement in a long period and Williams decided to design the Excel system by calling upon all of his years of experience and expertise.
Having spent his career in the scaffolding industry, much of it in the refinery and petrochemical market, Williams realized that “time is money”. He invented the perfect system to increase productivity, while raising the standards for safety with system scaffolding.
Williams took into account many of the time and money issues he dealt with while using tube, clamp and standard system scaffolding. He had firsthand knowledge of how deck and handrail spacing created issues with meeting OSHA standards, multi-craft scaffolds and less than desirable deck heights. He focused on the cost and time associated with scaffold modifications and the quantity of modifications required with most systems. Williams sought to mitigate the amount of tools and repetitive motions that hand tools required to erect other systems, which put employees at risk for injury, and the racking systems and housekeeping associated with other systems in the yard environment.
As a result, Williams designed a system with a node spacing every 5.75 inches so that decks could naturally be placed vertically at these intervals and eliminate the need for tube and clamp modifications or alterations to a standard scaffold. This node spacing also allows the Excel system to meet both OSHA and Cal/OSHA (California division of OSHA) handrail standards without any modifications necessary.
In stock
The Excel Truss is designed to provide added strength in applications where normal horizontals may not be strong enough to carry the necessary loads. Tubing for TR4, TR5, TR6, and TR7 is 1.90 dia. 12ga (0.108 wall), high strength min. 65,000 yield, 75,000 tensile. All other trusses are manufactured...
Group: Scaffolding
In stock
Adjustable bearers are designed to provide deck support, between two self-supporting scaffold structures, where traditionally only tube and clamp could be used. They may also be used to create odd sized scaffolds (ex: 5 ft x 6.5 ft). Outer tubing is 1.90 dia. 13ga (0.083 wall), high strength; min....
Group: Scaffolding
In stock
The Roof Adapter is a leg connector which can be used to create a temporary shelter with a tarp over the top.
Group: Repair parts and stuffs for a build technique
In stock
Excel Modular Lifting Devices are designed to allow a scaffold to be erected in a safe environment and then hoisted to the actual work locations.
Group: Repair parts and stuffs for a build technique
In stock
Filler Plates are designed to cover gaps between wood or metal boards. Filler Plates come in various lengths and contain holes that allow the Filler Plate to be tied or nailed in place.
Group: Formwork accessories
In stock
The Steel Plank (6") is a metal walk board for decking designed to fit in small gaps.
Group: Formwork accessories
In stock
Excel Vertical Legs come in many sizes to fit all scaffold needs and the 5.75 inch spacing means that the scaffold deck can always be placed at the height required. All tubing is 1.90 dia. 11ga (0.120 wall) high strength min. 65,000 yield 75,000 tensile. Verticals are designed to be compatible with...
Group: Scaffolding
In stock
Used to enter the deck from underneath scaffold rather than outside the deck.
Group: Planking
In stock
The Excel Rapid Access System is designed to provide "stair like" scaffold access in areas where there is not enough room for a scaffold stair tower.
Group: Planking
In stock
The Vertical Locking Clamp is designed to provide added strength to the vertical post connections. Vertical Locking Clamps must be installed on all vertical posts at the pin connection before lifting the scaffold.
Group: Quick connections for construction equipment